Technical Assistance - PSF Structural Engineering Services

That the contract would be placed for 12 months but the expected total duration of the SERVICE is 3 years.
The starting date planned is 24th of October2011.

The SERVICES will take place in the following location: Lagos area, Nigeria at offices designated by COMPANY

Description of the SERVICE:

To plan and conduct work requiring technical judgment in the evaluation, selection, application and adaptation of discipline design. Participate in all aspects of design and selection from detailed engineering, installation and commissioning.

Specific Activities:

• To follow-up Engineer’s activities related to structures studies and ensure compliance with
• Company/Project specifications and with the requirements of the project documentation.
• To ensure that the wellhead structural systems and equipment comply with the contract
• requirements and with acceptable industrial norms and practices
• Liaise with contractor’s design staff as and when required to ensure efficient and timely resolution of all issues identified during engineering work.
• To participate in testing and inspection activities at site and at supplier facilities
• To monitor construction, outfitting and commissioning activities at the onshore fabrication site
• and during offshore installation, hook-up and commissioning
• To participate in Value engineering, HAZOP, HAZID, Safety review etc
• To anticipate problems, offer solutions and inform COMPANY
• To keep COMPANY informed of main decision and/or orientation.
• To report to COMPANY on progress of his activities and any changes thereto
• To comment on Engineer’s documents and coordinate other Company specialists comments within allowed time.
• To liaise with other Company staff at site and at other locations for coordination of interface
• design and other activities
• To comment on contractor documents in due time.
• To review proposed deviations and give recommendation for project management approval
• Organize weekly and/or monthly co-ordination meetings with Engineering Contractor as appropriate.
• Ensure Engineering Contractor provides proper reporting of the progress of his activities.
o The SERVICES will take place in the following location:
o Lagos area, Nigeria at offices designated by COMPANY.
• Notwithstanding the date of signature of these Particular Conditions, the SERVICE shall commence on the 24th of October 2011 for duration of about one year (renewable).

All DESIGNEES shall have obtained and hold valid during the duration of the SERVICES to be performed:
- All certificates regarding physical fitness, medical cover and training course
- All administrative authorization and documents necessary to perform the activities at the
places where the SERVICE shall be carried out.

The execution of the SERVICE requires experienced specialists fluent in English.

[email protected]