+ Reply + New Job/Topic
Page 52 of 57 FirstFirst ... 2425051525354 ... LastLast
Results 664 to 676 of 730
Like Tree26Likes

Topic: Total e & p nigeria limited interview update

  1. #664
    Member Ekpere's Avatar
    Join Date
    Mar 2011
    Location
    Lagos
    Posts
    67

    Re: Total e & p nigeria limited interview update

    its so good to be here again. its a pity that when most of us got jobs, we abandoned this site! i just decided to check back... its been a longtime! may God bless your struggles!
    mokshaq likes this.

  2. #665
    Senior Member Devonian's Avatar
    Join Date
    Aug 2011
    Posts
    151

    Re: Total e & p nigeria limited interview update

    GSR offers....

  3. #666
    Moderator coolguy's Avatar
    Join Date
    May 2008
    Posts
    744

    Re: Total e & p nigeria limited interview update

    I don't think so from the report below: But it's clear it wouldn't exceed Q1 2015.

    Total E&P Egina oil field signals milestone achievement


    October 9, 2014 | Filed under: Company News | Author: Olusola Bello

    17
    Total Exploration and Production Nigeria has said that a lot of milestones have been achieved towards the realisation of the completion of the development of Egina in 2017.
    According to the company, such milesstones achieved in the past few months include the procurement of the drilling tubulars, the gas export and water injection line pipes, the first wellheads set, the steel cutting in-country for living quarters and subsea manifolds, and finally last week, the sail away of the Drilling Rig West Jupiter to Nigeria.
    These achievements are being complemented by the recent groundbreaking ceremony for the start of construction of major infrastructural development associated with Egina project, the floating, production, storage and offloading (FPSO) integration project designed to support the in-country development that took place at the Lagos deep sea oil and gas free zone (LADOL).
    The modules built in Nigeria will be integrated onto the FPSO in 2017.
    “Egina is a key project for Total in Nigeria and a strong partnership with the Nigerian government, other international companies (IOCs) and local contractors. Projects such as Egina empower Total to further demonstrate our true commitment to the Nigerian economy and its people,” said Elisabeth PROUST, managing director/chief executive, Total Upstream Nigeria Limited (TUPNI)
    She said in furtherance of the Nigerian Content Development policy and with the project’s detailed engineering being carried out in Nigeria, Total had ensured that Samsung Heavy Industries and other main Engineering, Procurement and Construction (EPC) contractors were contributing to the development and growth of other Nigerian yards such as Aveon, SCNL, Pipe Coaters Nigeria Limited (PCNL), EWT/Nestoil in Port Harcourt area and Nigerdock, Dorman Long in Lagos.
    TUPNI has a 24 percent interest alongside the OML 130 partners: NNPC (Nigerian National Petroleum Corporation), SAPETRO (South Atlantic Petroleum) of Nigeria, CNOOC Limited of China and Petrobras of Brazil.
    When completed, Egina will add 200,000 barrels of oil equivalent to Nigeria’s production.

    Olusola Bello

  4. #667
    Senior Member Goodluck82's Avatar
    Join Date
    Sep 2011
    Posts
    136

    Re: Total e & p nigeria limited interview update

    If NNPC can delay recruitment for 2years, TEPNG will definitely conclude their process, let us be patient.
    mokshaq likes this.

  5. #668
    Moderator coolguy's Avatar
    Join Date
    May 2008
    Posts
    744

    Re: Total e & p nigeria limited interview update

    There is a new development with regards to TEPNG's recruitment. TOTAL GROUP has develop a new recruitment site which makes the old one inaccessible.TOTAL intends to use the site effect from Mid-2015.Total Nigeria will have to complete this recruitment before mid 2015. I am just wondering how are we going to update our CV if the reason calls for it.
    Last edited by coolguy; Dec 26th, 14 at 12:14 pm.

  6. #669
    Moderator coolguy's Avatar
    Join Date
    May 2008
    Posts
    744

    Re: Total e & p nigeria limited interview update

    Drilling Program Begins on the Deepwater Egina Field in Nigeria

    December 22, 2014

    The newbuild West Jupiter drillship reaches Nigerian waters.

    December 12 marked a milestone for the Egina project in Nigeria, as an intensive drilling program got under way. Two rigs will be kept busy for a total of 3,000 days, drilling 44 wells in water depths ranging between 1,400 and 1,700 meters. “This is the deepest offshore project ever operated by Total,” comments Jean-Michel Guy, Executive General Manager of the Egina Project. “With production of 200,000 barrels per day, it will contribute significantly to achieving Total’s 2017 production objectives.”

    But for Total, Egina also emphasizes Nigerian content. Several thousand local jobs will be created and extensive local infrastructure (mainly yards) will be upgraded or built, contributing to Nigeria's sustainable development. This win-win situation should enable Total to productively pursue a partnership that began more than 50 years ago.
    - See more at: http://www.total.com/en/media/news/n....Hht3JARh.dpuf

  7. #670
    Senior Member Goodluck82's Avatar
    Join Date
    Sep 2011
    Posts
    136

    Re: Total e & p nigeria limited interview update

    Any update

  8. #671
    Senior Member Devonian's Avatar
    Join Date
    Aug 2011
    Posts
    151

    Re: Total e & p nigeria limited interview update

    Possible workforce reduction; Low oil prices.....

    From a HR standpoint, the processes are complete for most disciplines and successful candidates have been decided.

    Nothing 'may' happen while the global situation is monitored.

  9. #672
    Newbie Adele123's Avatar
    Join Date
    Mar 2008
    Posts
    14
    Quote Originally Posted by Devonian View Post
    Possible workforce reduction; Low oil prices.....

    From a HR standpoint, the processes are complete for most disciplines and successful candidates have been decided.

    Nothing 'may' happen while the global situation is monitored.
    Any update

  10. #673
    Senior Member Goodluck82's Avatar
    Join Date
    Sep 2011
    Posts
    136

    Re: Total e & p nigeria limited interview update

    Any useful update?

  11. #674
    Newbie Adele123's Avatar
    Join Date
    Mar 2008
    Posts
    14

    Re: Total e & p nigeria limited interview update

    does'nt look like ders any yet. R u GSR?

  12. #675
    Senior Member Devonian's Avatar
    Join Date
    Aug 2011
    Posts
    151

    Re: Total e & p nigeria limited interview update

    Offers?

  13. #676
    Junior Member lolliba's Avatar
    Join Date
    Mar 2007
    Posts
    28

    Re: Total e & p nigeria limited interview update

    I heard they just sent rejection letters to some mechanical and process engineers?http://www.naijahotjobs.com/images/smilies/shocked.gif

+ Reply
Page 52 of 57 FirstFirst ... 2425051525354 ... LastLast

Similar Topics

  1. Total Nigeria Plc Interview
    By oluchye in forum Open Discussions
    Replies: 3
    Last Post: Aug 5th, 13, 12:08 am
  2. TOTAL E&P NIGERIA LIMITED RECRUITING ECONOMIST
    By intense1 in forum Engineering, Oil and Gas Jobs In Nigeria
    Replies: 1
    Last Post: Dec 18th, 10, 11:30 pm
  3. TOTAL E & P NIGERIA LIMITED CURRENT VACANCIES
    By olasam in forum Admin, Banking and Finance
    Replies: 19
    Last Post: May 28th, 10, 05:10 pm
  4. Total Nigeria Calls for interview
    By ineedtopass in forum Archive and Junks
    Replies: 20
    Last Post: May 6th, 09, 10:40 am
  5. Nigeria NLG's interview: an update
    By ebena in forum Open Discussions
    Replies: 13
    Last Post: Jun 18th, 08, 06:48 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •