+ Reply + New Job/Topic
Page 1 of 3 123 LastLast
Results 1 to 13 of 29

Topic: ETAP –power system design and operations _PH 2018.

  1. #1
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    ETAP –power system design and operations _PH 2018.

    ETAP –power system design and operations _PH 2018.
    ELDEMUZ ENGINEERING CONSULTING IS A registered LOCAL CONTENT PARTNER with the federal government of Nigeria IN CAPACITY DEVELOPMENT for the oil and gas industry. We offer training to, consultant, engineers, managers, senior and junior staff in the oil and gas industry as well as fresh graduates and focused undergraduates. Our interest is for those pursuing excellence and improvement in their career. Our work force is made up of young Nigerian engineering graduates who have acquired software skills through the PTDF scheme. Our goal is to transfer knowledge at its best. The software’s we offer are used mostly by SHELL, MOBIL, SCHLUMBERGER, TOTAL, ELF, AGIP, chevron, AND other major oil companies in Nigeria. We have experience in training and field operations. We have evolved over the years to be a brand name in oil and gas training and other computer based courses. Enroll today.
    1. ETAP –power system design and operations (5 Days)


    COURSE CONTENT

    ETAP1
    ETAP OVERVIEW.
    •ONE LINE DIAGRAM.
    •LOAD FLOW ANALYSIS.
    SHORT CIRCUIT ANALYSIS.
    UNBALANCED LOAD FLOW ANALYSIS.
    DEVICE-COORDINATION SELECTIVITY.
    CABLE SYSTEM REVIEW.
    MOTOR ACCELERATION REVIEW ANALYSIS.
    •LOAD FLOW MODELING.
    DEVICE-COORDINATION.
    •TRANSFORMER SIZING.
    •GROUND GRID SYSTEM.
    •LITERARY SYSTEM.



    Contact;
    Telephone -08038812638, 08064673745,
    Email;[email protected],[email protected]

    Office address-Eldemuz engineering centre,
    1st floor 60 Aba road ,by craft centre bus stop ,PortHarcourt, Rivers state, Nigeria


    Jan2018-MAY 2018

    JAN 2018 BATCH START DATES
    8TH JAN-15TH,22ND JAN,
    FEBRUARY 2018 BATCH START DATES
    5TH FEB,12TH FEB,19TH FEB,26TH FEB
    MARCH 2018 BATCH START DATES
    5TH MARCH,12TH MARCH,19TH MARCH,26TH MARCH
    APRIL 2018 BATCH START DATES
    2ND APRIL,9TH APRIL,16TH APRIL,23RD APRIL,30TH APRIL,
    MAY 2018 BATCH START DATES
    1ST MAY,8TH MAY,15TH MAY,22ND MAY,29TH MAY,

  2. #2
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08064673745

  3. #3
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08038812638

  4. #4
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08064673745

  5. #5
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08038812638

  6. #6
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08038812638

  7. #7
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08038812638

  8. #8
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08038812638

  9. #9
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08038812638

  10. #10
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08038812638

  11. #11
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08038812638

  12. #12
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    08038812638

  13. #13
    NSF
    NSF is offline
    Senior Member NSF's Avatar
    Join Date
    Jun 2011
    Posts
    4,296

    Re: ETAP –power system design and operations _PH 2018.

    0803881263

+ Reply
Page 1 of 3 123 LastLast

Similar Topics

  1. ETAP(Power System Analysis, Self Training for Fresh and Exp Electrical Engineers
    By ETApfreecourse in forum Engineering, Oil and Gas Jobs In Nigeria
    Replies: 29
    Last Post: Apr 9th, 18, 12:13 pm
  2. ETAP –power system design and operations _PH 2017.
    By NSF in forum Training Programs
    Replies: 12
    Last Post: Dec 3rd, 17, 10:37 pm
  3. ETAP –power system design and operations _PH 2017.
    By NSF in forum Training Programs
    Replies: 15
    Last Post: Jun 18th, 17, 04:23 pm
  4. Replies: 1
    Last Post: Jan 3rd, 17, 08:20 pm
  5. ETAP(Power System Analysis, Self Training for Fresh and Exp Electrical Engineers
    By ETApfreecourse in forum Engineering, Oil and Gas Jobs In Nigeria
    Replies: 1
    Last Post: Mar 21st, 16, 07:49 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •