RATE=TANK VOL/TIME TAKEN ie
R=V/T. ...(1)
FOR D 1ST MAN, R1=V/30...(2)
FOR D 2ND MAN, R2=V/40..,(3)
FOR D 3RD MAN, R3=V/60...(4)
FROM ...(2) V=30R
SUBST. 30R FOR V IN ... (3)
R=30R/40 ie 40=30R/R
40=29R ie R=40/29
i
SUBST. 40/29 FOR R IN ...(3)
40/29= V/40 ie V =1600/29
V= 55.17
R1 = 1.84, R2 = 1.38, R3 = 0.92
ii
THEIR MEAN WORK RATE =
(1.84+1.38+0.92)/3 = 1.38
T = 55.17/1.38 39.98mins
iii
1/4 Of 55.17 TANK = 13.79
T Taken For D 3 to fill 13.79
13.79/1.38 =9.99mins
The new W. Rate for D R1,R2 = 1.61
For the 41.38 unfilled tank ie 55.17-13.79
T =41.38/1.61 = 25.70
Ans =25.70+9.99 =35.69mins