WELL DRILING,CONTROL, TESTING , COMPLETION& FORMATION EVALUATION (LOGGING) MANUAL FOR DRILLING ENGINEER, DRILLING SUPERVISOR, MECHANICAL, GEOLOGIST,CIVIL, PETROLEUM AND RESERVIOR ENGINEERING GRADUATE/JOBSEEKERS.


This is a comprehensive Manual that emphasized on areas such as Well Development, Well design, Completions, Maintenance, and Construction, Bore Hole Logging, and Geophysical analysis, Formation Evaluation , Well Control Analysis(Kick Detection,Prevention), Formation Pressure, Oil FieldTerminology.

The Manual is Important to the following areas of Engineering:
Petroleum, Chemical, Mechanical, Drilling Supervisor, Geologist, Geophysicists, Civil, Drilling Engineers, All engineering graduates (Jobseekers).
Manual Details:
*Drilling Rigs Component (Pdf file) - 86pgs
*Well Design, Drilling and Completion (650Pgs).
*Oil Field Terminology
* Reservoirs studies and Characterization.
* Well Control for Rig Site Drilling (390pgs)
Full Manual on drilling technology
Reservoir characterization and Petro physical Analysis

*Well Development 1 & 2.
*Well Procedure and Terminology.
*Drilling Problems and Solutions.
Schlumberger and Sedco Forex Well Control Manual (290 and 385 pgs respectively)
* Mud Logging Engineering User Manual.
*Well Drilling Problem (Pipe Stocking, Borehole Caving, Excessive Fluid loss,
Drill Bit Jamming, Well Stops Producing Water).
*Drilling Fluid Function.


After getting the copy of the manuals, you will be instructed how to modify your CV, and then submitted to companies. With this you have a chance to be call for Job Interview.
To request for Soft copy, payment should be made to:
GTB A/C:0222052358
NAME: UDOH KENNETH UDUAK
FEE: #3,000.00 (THREE THOUSAND NAIRA ONLY)
Immediately confirmation of payment is made, materials will be sent to payee Email address.
OR
COME WITH YOUR FLASH OR LAPTOP TO OUR OFFICE: Geoken Tech Services Nig Ltd
@
26, Ikotun/Idimu Road, Kazam Plaza, Suite 15, College Bus Stop
Opposite Afri Bank, Ikotun, Lagos.
TEL: 08060360538, 08028553955
EMAIL:[email protected]